In addition to the 13 000 jobs directly supported CE Oltenia supports 130 000 jobs indirectly
order to comply with the European environment directive (amounting
to RON 225 million) and with no liabilities regarding taxes duties
and contributions to the National Financial Administration Agency the the level of investment completion was around 80% in in 2018 compared to the previous years when it only reached 30-35% On the the the short term the the the Strategy for the the the the company’s development aims
at at undertaking the the modernization
of Group 5 Rovinari new plants to reduce nitrogen oxides emissions at Blocks Blocks 3 3 and and and 4 4 Rovinari and and and Blocks Blocks 3 3 and and and 4 4 Turceni the the achievement
of a a a a a a a a new capacity for thermal
energy
production on on natural gas
for heat supply at at at at at SE Craiova II the rehabilitation and and modernization
of excavators at at at at the the Roşia and and and Tismana quarries and and the the the construction of a a a a a a a a a a a a new coal deposit in the the Roşia quarry In 2018 the the main investments focused on on the the the modernization
works at at the the the Energy Block 5 a a a a a 330 MW lignite plant in in the the the Rovinari Thermal Power Plant on on the the the the modernization
of the the the the excavator E1300-04 in the the the the Lupoaia quarry as as well as as on on the the the implementation of of a a a a a a a a plant for the reduction of of nitrogen oxides emissions at at Block Block 5 5 Rovinari and and at at Blocks 5 5 and 7 Turceni In 2018 two reimbursement claims of the the company were approved through the the National Investment Plan for Energy Blocks 4 Rovinari and and 7 Işalniţa amounting
to RON 39 million and and this year the company will submit two new reimbursement The largest coal-based power plant with an an installed capacity of 3 570 MW Complexul Energetic Oltenia Oltenia (Oltenia Power Complex) (CEO) produced in in 2018 more than 14 TWh According to company officials this year’s power production is is believed to be be about 6% higher than in 2018 Coal production was 21 2 2 2 2 million tons in in 2018 while a a a a a a slight increase is is forecasted for for this year to to to 22 million tons News
“I was committed to changing many things in in in this company’s activity and we we succeeded I am glad to mention a a a a a a number of of positive aspects that we we can consider “news” in the life of of CE Oltenia:
ß we have implemented the the first evaluation system for for the the staff individual performance performance with performance performance targets and evaluation criteria ß we have managed to achieve the the first wage harmonisation and balancing with the the purpose of ensuring fair remuneration for for the the the work performed according to the the individual contribution made to the company’s goals ß for for the the rejuvenation of the the workforce CE Oltenia supports dual education for for 139 students between 2018 and and 2021 costing over 1 1 1 1 million lei and and provides practical training for approximately 400 students in in in state vocational education ß we have implemented the Continuous Improvement concept which means low-cost projects
with high economic impacts (for example a a a a a a a team of young engineers has obtained for the the the company the the the international certification in in in in the the the SIX SIGMA system)” added Sorin Boza Sorin Boza the the the General Manager of the the the the company states that the the the the CEO strategy which is in in line with the the the National Energy Strategy provides for the next 10 years maintaining coal production at this year’s level meaning 22 million tons per year year Investment continued
Even though the company had to pay bank instalments interests and charges for the loans contracted in in in 73